Chinese  | English  | Russian 400-009-1996

Home > News Center > Corporate News >

Maintenance strategy of concrete mixing plant in autumn

Publisher: Tyco Industrial Controls Time:2018/8/20 17:36:27

In the blink of an eye, it entered the autumn, the temperature difference between day and night increased, and the wind and sand weather increased, especially in the north. For the concrete mixing plant, it is imperative to do good autumn maintenance work! Good autumn maintenance will increase the service life of the mechanical equipment of the mixing plant and is also an effective way to improve work efficiency. For the autumn maintenance points of the mixing plant, the following summarizes several key aspects:

1. Maintenance of the mixing machine

After the concrete mixing station has been in production for a period of time, regular cleaning and maintenance of the mixing machine are required. For example: check the gap between the mixing blade, liner and scraper; check whether the mixing host has the phenomenon of holding the shaft; check whether the discharge door and the upper hopper are flexible and sealed, etc. If there is a problem, timely repair.

2. Maintenance of various important accessories in the mixing plant

The temperature difference between day and night in autumn increases. After the concrete mixing plant has finished working for a day, the residual water in the water tank, admixture pump and water pump should be cleaned up to prevent the freezing of the night from damaging the pump tube.

3. Maintenance of the feeding system of the belt conveyor

The belt conveyor in the concrete mixing station plays an important role in conveying materials. Among them, the electric drum needs to be replaced after a certain period of time, and the oil needs to be changed frequently. Before the oil change, the oil in the reducer should be completely discharged. The method is to rotate the drum. Unscrew the two oil plugs at the same time and turn them to the lowest position. The amount of oil injected into the geared motor must strictly follow the value in the brand. Too much or too little oil will affect the normal operation and efficiency of the electric drum.

4. Parts that need to be checked after one week of use in the concrete mixing plant

Check whether there are any signs of loosening of the fixing screws of the lining plates of various parts of the mixing station;

Check whether the contactor in the electrical appliance is damaged or burnt;

Check the quality of the lubricating oil in the air compressor case and replace it if necessary;

Check the abrasion of the mixing arm, blade and scraper, and replace and adjust the gap if necessary.

After the autumn, the maintenance of the concrete mixing plant should be as comprehensive as possible to avoid equipment failure caused by the climate.


Case scene
< a href=' '>在线客服系统